top of page

01/30/25

May 2012
Landslide caused the loss of soil westwards from about 6 feet from Carino. This soil was never replaced and Carino was closer to the edge of the slope where Lot 72's 5 foot sidewalk will be positioned.

LOT 72 Plat
Plat included in Declaration

Dec 2024
Dec 2024

CRYSTAL LAKE BLAMES MWC FOR THE 2012 LANDSLIDE
!
MWC Denied that it was their fault!

Carino Ln. Google Street View taken on April 2024.
Carino Ln. Google Street View taken on April 2024. The PUE bench was alreadyslipping.

Carino Ln. April 2024
Google Streetview of SW end of Carino Ln. taken from Google Maps. Note the date. This was before the "earthen buttress" was removed and cracks appeared.

Carino LN October 2008
Beautiful Carino Lane in Oct 2008 before lot 72 collapsed

April 2024
Declarant's 2017 Earthen Buttress is removed and the slopes reshaped

April 2024
Declarant's 2017 Earthen Buttress is removed and the slopes reshaped

April 2024
Declarant's 2017 Earthen Buttress is removed and the slopes reshaped

2024?
New asphalt

2024 Undated
2024 Undated

2024 Undated
2024 Undated

2023

2023

2023
SW Carino Lane

2023
Carino Storm Drain slipping

2023
Rubble dumped into fissures to hide them

2023

2023
Subsidence

2023

2023
Rubble dumped to fill and cover up fissures

2023

2023
Rubble dumped onto 5ft sidewalk Lot 72

2023
Another storm drain sunsiding